+86-571-88550927

Contact Us

  • Factory: No.90 xinxin Rd, Fengdu industrial zone, Hangzhou, China.311115.
  • Office: Rm 707, 3# haloplaza, Liangzhu, Yuhang Dist, Hangzhou, China.
  • Jeffkf1502@163.com
  • Tel: +86-0571-88550927

  • Fax: +86-0571- 88550920

  • Wechat / Whatsapp: + 86 18758159121

What Is The Effect Of Holding Your Breath in The Case Of A Shock-resistant Pressure Gauge?

May 31, 2021

What is the effect of holding your breath in the case of a shock-resistant pressure gauge?

Y09

Generally speaking, most shock-resistant pressure gauges affect the verification results due to the holding of the gas in the watch case. Most of them are instruments with a small range. According to the experience of the manufacturer, they are mostly pressure gauges below 0.6MPa, and meters below 0.6MPa, especially 0.16MPa. The 0.25MPa meter, due to its thin spring tube wall and high sensitivity, will have a greater impact on it if the gas is held in the watch case during the verification, and it is generally manifested as a negative difference. For pressure gauges above 1MPa, due to the high rigidity of the spring tube, even if the oil hole plug is not opened during the verification, the residual gas in the watch case will not have much influence on the verification result. The larger the range, the more so.


   Regarding whether the oil hole plug on the pressure gauge should be removed during use of the instrument, considering the impact of the instrument on the accuracy of the measurement, the oil hole plug on the shock-resistant pressure gauge should be removed before use. It is correct. The only thing is that if the oil hole plug is removed, dust, dirt and rain will be included in the watch case, which will have a more adverse effect on the meter. Second, if the oil hole plug is removed, it may be possible. It will be lost due to improper storage, which will bring great inconvenience to the maintenance of the instrument in the future.


   Therefore, the oil hole plug can be removed during the verification of the anti-vibration pressure gauge, and the oil hole plug can be installed after the verification is completed. However, do not remove the oil hole plug during use, but remove the small pillar protruding from the oil hole plug. The small column is hollow and communicates with the inside of the meter, and the meter will not hold your breath. It can be blocked by toothpicks and the like because the hole is small and easy to repair.



Send Inquiry